中和数字能源项目案例
Case Study of Industrial and Commercial Energy Storage Projects
Case study of household energy storage project
全国服务热线
Project Introduction
| Client | A large manufacturing company in Taiwan, China |
| Product | 125kW/261kWh |
| Quantity | 12 Units |
| Cooperation Model | ODM |
| Time | March 2025 |
Project Highlights
·The EMS system interfaces with Taiwan's peak, semi-peak, and off-peak electricity pricing periods to maximize revenue;
·Real-time load monitoring effectively "shaves" peak demand, avoiding demand charge penalties;
·Achieves on-grid/off-grid switching within 15ms during grid anomalies, effectively protecting precision instruments from voltage sags;
·Equipped with a cloud monitoring platform for remote diagnosis and early warning, reducing O&M costs by 40% compared to traditional solutions;
·Annual carbon reduction exceeding 100 tons, building a "green factory" brand image and enhancing industry competitiveness.










