中和数字能源项目案例
Case Study of Industrial and Commercial Energy Storage Projects
Case study of household energy storage project
全国服务热线
Project Introduction
| Client | A power station in Ningbo, Zhejiang |
| Product | 208kW/418kWh |
| Quantity | 6 Units |
| Cooperation Model | ODM |
| Time | May 2025 |
Project Highlights
·Cabinet features high-strength corrosion resistance to adapt to harsh environments, with functional zoning isolation inside;
·The system has complete grid dispatch response functions, capable of quickly responding to grid commands and meeting the station's peak shaving and frequency regulation needs;
·Established a 24/7 remote monitoring platform with a comprehensive spare parts support system to ensure high system availability;
·Intelligent thermal management control algorithm maintains temperature difference within the entire cluster to less than 3°C;
·Based on the successful implementation of the initial phase, both parties have reached a consensus on subsequent expansion plans, aiming to further deepen the cooperative relationship.










